The problem: a 1970s hall with a failing boiler

When the boiler at Marsh Lane Community Hall failed in early January, the trustees faced a familiar choice: patch the old system or plan for a heat pump. The hall serves about 120 people a week through a main room, kitchen, toilets and a long corridor. The main room was warm enough on mild days, but the corridor stayed cold, and the committee had no room-by-room heat-loss figure to guide a decision. They asked bananzia to run a narrow retrofit assessment before committing to any equipment.

The cause: a single thermostat hid the real load

The building had one thermostat in the main hall and a boiler sized for the whole footprint. That setup masked two causes of the problem: uninsulated corridor pipework and oversized radiators in the main room that encouraged short cycling. The kitchen extension, added in 1988, had never been zoned separately. Bananzia’s survey split the hall into four zones and logged temperatures at 15-minute intervals for two weeks. It also recorded radiator sizes, pipe routes and door draughts, because a heat pump decision depends on the coldest room, not the average temperature.

The solution: a four-step heat-pump readiness plan

The assessment did not recommend a heat pump immediately. It produced a phased plan that treated the building fabric and emitters first, so a future low-temperature system would not be forced to compensate for avoidable losses.

  1. Zone the heating. Separate the corridor, kitchen, main hall and toilets with thermostatic control so the boiler no longer heats empty rooms.
  2. Fix the corridor losses. Insulate exposed pipework and draught-proof the fire door before any plant upgrade.
  3. Resize emitters. Replace two undersized radiators in the kitchen and keep the main hall radiators, which already work at lower flow temperatures.
  4. Model the switch. Use bananzia’s room-by-room outputs to compare a hybrid retrofit with a full heat-pump installation, including electrical supply limits.

The result: a smaller, cheaper first phase

The trustees approved the corridor insulation and zoning work first, at roughly one-third of the cost of an immediate boiler replacement. The modelled heat demand fell by 18%, and the remaining boiler now runs for longer, steadier periods. More importantly, the hall has a documented path to a heat pump: fix the envelope, zone the building, then size the plant against measured data rather than a single thermostat reading.

For small community buildings, the lesson is practical. A heat-pump plan is only as good as the survey behind it. Bananzia’s value in this project was not a dramatic technology swap; it was the discipline to isolate the cold corridor, quantify the losses, and sequence the work so the next boiler decision starts from evidence.